Inclement weather last month hindered progress on lengthening the pier which was at 630 meters by month’s end. They were still able to continue building up the east side with 10 ton cubes to protect the small rock. “As it stands we have still added 50 meters in length to the pier, bringing it to 680 meters,” reported Wendy.
They’ve poured around 13,000 small cubes (one ton size) and placed 6,000 of them on the jetty. There are almost 3,000 large cubes (10 tons) poured and waiting to be placed. They are expecting an even larger crane in about two weeks that will start placing the big cubes along the jetty…